Future Projects

The Clairton Municipal Authority is planning an upgrade to the treatment plant to solve the problems associated with peak flows during rainfall events causing exceedences at the plant due to overflows at the pump station.  The upgrade project will also include future biological nutrient removal (BNR) capability.

Grants

The Authroity has received  a CITF Grant that will go towards rehabilitating up to 18 different sections of pipe that have Level 5 structural defects.

The Authority has applied for other grants such as the CDBG Grant.

CMA Completed Projects

Collection System Improvements

  • The entire sanitary sewer system has been televised to determine any defects.

  • A GIS program was developed to map out the entire sanitary sewer system.

  • A new pump station was built at the end of Miller Avenue.

  • New pipe and manholes installed on Payne Avenue.

  • New pipe installed at Glick Avenue hollow.

  • New pipe and manhole installed on Miller Avenue near the stadium.

  • New pipe installed on Beech Alley behind Rite Aid.

  • New pipe installed on Aster Way.

  • Several  storm sewer catch basins have been replaced or rebuilt.

  • Storm sewer catch basin cleaning.

  • Regular street sweeping.

  • Purchased new billing software system.

 

 